Part of Google's $9 billion South Carolina investment through 2027. Operating and expanding.

Knowledge
49/100
Evidence
0/100
Freshness
80/100
Relationships
45/100
Completeness
45/100
Transparency
75/100
Evidence
0
Timeline
0
Relationships
3
Last Reviewed
Jul 24, 2026

Google Berkeley County Data Center Campus

Expanding◆ confirmedData Center
Moncks Corner, Berkeley County Last Updated: Jun 15, 2026 0 Public Sources
Brief

Executive Summary

Part of Google's $9 billion South Carolina investment through 2027. Operating and expanding.
Metrics

Project Snapshot

Key project metrics at a glance.

Estimated Investment
$9B (statewide through 2027)
Estimated Jobs
200
Power Demand
—
Water Demand
—
Site Acreage
520+ acres
Project Status
expanding
Utilities

Cooling, Water & Electricity

Power, cooling, water, and wastewater for this project.

Utilities

Cooling, Water & Electricity

How this project is powered, cooled, and connected to local water and wastewater systems. Figures are drawn from public records and developer disclosures.

IT Cooling & Heat Rejection

Data centers remove heat in two stages: first from the servers (IT cooling), then from the building to the outdoors (heat rejection). The methods chosen drive water use, energy overhead, and neighborhood noise.

IT equipment
Evaporative Cooling
Heat rejection
Unknown
Atmosphere
IT cooling method
Evaporative Cooling
Heat-rejection method
Unknown
Cooling tower present
True
Closed-loop claimed
Unknown
Economizer (free cooling)
Unknown
Hybrid capability
No

Water Source & Demand

Data centers use water mainly for evaporative cooling and humidification. The source, quality, and use of reclaimed water determine the impact on local supply and aquatic systems.

Source: Surface Water
Unknown
Facility
Discharge
Water provider
Berkeley County Water & Sanitation
Provider type
Unknown
Primary source
Surface Water
Cooling-water quality
Unknown
Average daily demand
1,800,000 gal/day
Peak daily demand
1,500,000 gal/day
Annual demand
549,000,000 gal/year
Provider upgrade required
Unknown

Wastewater Discharge

Water leaving the site is treated on-site, sent to a municipal plant, discharged directly, or evaporated. Zero-liquid-discharge (ZLD) systems eliminate liquid discharge entirely.

Facility
Unknown
Environment
Wastewater provider
Berkeley County Water & Sanitation
Discharge method
Unknown
Upgrade required
Unknown

Electric Provider & Interconnection

A data center is among the largest electric loads a utility can serve. Demand is measured in megawatts; PUE relates total facility power to IT power (1.0 means all power reaches the IT equipment).

Grid
Substation
Facility
IT load
Retail provider
Berkeley Electric Cooperative
Interconnection utility
Santee Cooper
Provider type
Unknown
Full-buildout demand
1,000 MW
Total facility load
380 MW
Interconnection status
Unknown
Substation upgrade required
Unknown
Transmission upgrade required
Unknown
Backup fuel
Unknown
Demand-response participation
Unknown

Renewable Energy Claims

Renewable claims describe how a facility matches its consumption with clean generation. The geography and matching method determine whether the claim reflects new, local clean energy or paper certificates.

Renewable Energy Credits (RECs)
Matching
Facility
Renewable claim
Net-Zero Carbon Emissions Across Its Operations And Value Chain By 2030
Claim type
Renewable Energy Credits (RECs)
Renewable percentage
100 %
Claim geography
Unknown
Officially AnnouncedConfidence: MediumVerified: Jul 27, 2026
Chronology

Project Timeline

Chronological history of project milestones and public activity.

This activity timeline is currently being expanded as additional public information becomes available.

Geography

Project Location

Geographic location and transportation context.

Geographic Location

Exact project boundary not yet verified.

Moncks Corner, Berkeley County
Google Maps
Municipality
Moncks Corner
Nearby Transportation
Being verified
Sources

Research Library

Public sources and research articles associated with this project.

https://www.google.com/about/datacenters

Other
Open
Press

News & Public Information

Chronological list of public news articles.

Research for this project is currently being expanded.

Records

Public Documents

Downloadable public resources and official records.

Planning Documents

Not yet available

Rezoning Documents

Not yet available

Meeting Minutes

Not yet available

Utility Filings

Not yet available

Environmental Reports

Not yet available

Developer Presentations

Not yet available

Community

Questions Communities Often Ask

Common questions about digital infrastructure projects.

Knowledge Graph

Related Resources

Discover connected organizations, projects, research, and policy across the platform.

Community

Help Improve This Resource

The Alliance continuously improves project information through public records and community contributions.

If you know of additional public information or believe this page can be improved, we encourage your participation.

Relationship Graph5 connections
Counties (1)
Berkeley
LOCATED_IN · outgoing · high
Organizations (2)
Berkeley Electric Cooperative
SERVES · incoming · high
Google
OPERATES · incoming · high
Stakeholders (2)
Lilyn Hester
REPRESENTS · incoming · medium
Amber Tillman
REPRESENTS · incoming · medium