Skip to main content
Knowledge Profile
VerifiedPublished
Knowledge
34/100
Evidence
0/100
Freshness
100/100
Relationships
15/100
Completeness
28/100
Transparency
25/100
Evidence
0
Timeline
1
Relationships
1
Last Reviewed
Jul 25, 2026
Charter Communications (Spectrum)

Spectrum Fiber-Optic Network Expansion

Active◆ highMixed Infrastructure
Newberry County, Newberry County Last Updated: Unverified 0 Public Sources
Brief

Executive Summary

Spectrum launched a fiber-optic network expansion in Newberry County to provide gigabit broadband to unserved rural areas. The project is part of Spectrum's approximately $5 billion investment in unserved rural communities through the FCC's Rural Digital Opportunity Fund (RDOF). The initial launch brought high-speed internet, mobile, and voice services to more than 300 homes and small businesses in the county.
Metrics

Project Snapshot

Key project metrics at a glance.

Estimated Investment
Not specified
Estimated Jobs
—
Power Demand
Not specified MW
Water Demand
—
Site Acreage
Not specified
Project Status
Active
Utilities

Cooling, Water & Electricity

Power, cooling, water, and wastewater for this project.

Utilities

Cooling, Water & Electricity

How this project is powered, cooled, and connected to local water and wastewater systems. Figures are drawn from public records and developer disclosures.

IT Cooling & Heat Rejection

Data centers remove heat in two stages: first from the servers (IT cooling), then from the building to the outdoors (heat rejection). The methods chosen drive water use, energy overhead, and neighborhood noise.

IT equipment
Unknown
Heat rejection
Unknown
Atmosphere
IT cooling method
Unknown
Heat-rejection method
Unknown
Cooling tower present
Unknown
Closed-loop claimed
Unknown
Economizer (free cooling)
Unknown
Hybrid capability
No

Water Source & Demand

Data centers use water mainly for evaporative cooling and humidification. The source, quality, and use of reclaimed water determine the impact on local supply and aquatic systems.

Source: Unknown
County Authority
Facility
Discharge
Water provider
Newberry County Water & Sewer Authority
Provider type
County Authority
Primary source
Unknown
Cooling-water quality
Unknown
Provider upgrade required
Unknown

Wastewater Discharge

Water leaving the site is treated on-site, sent to a municipal plant, discharged directly, or evaporated. Zero-liquid-discharge (ZLD) systems eliminate liquid discharge entirely.

Facility
Unknown
Environment
Wastewater provider
Newberry County Water & Sewer Authority
Discharge method
Unknown
Upgrade required
Unknown

Electric Provider & Interconnection

A data center is among the largest electric loads a utility can serve. Demand is measured in megawatts; PUE relates total facility power to IT power (1.0 means all power reaches the IT equipment).

Grid
Substation
Facility
IT load
Retail provider
Dominion Energy, Newberry Electric Cooperative, Duke Energy Carolinas, City of Newberry Utilities
Provider type
Mixed (Investor-Owned Utility, Cooperative, Municipal)
Interconnection status
Unknown
Substation upgrade required
Unknown
Transmission upgrade required
Unknown
Backup fuel
Unknown
Demand-response participation
Unknown

Renewable Energy Claims

Renewable claims describe how a facility matches its consumption with clean generation. The geography and matching method determine whether the claim reflects new, local clean energy or paper certificates.

Carbon Neutrality
Matching
Facility
Renewable claim
Carbon Neutrality In Its Operations By 2035
Claim type
Carbon Neutrality
Claim geography
Unknown
Developer ReportedConfidence: MediumVerified: Jul 27, 2026
Chronology

Project Timeline

Chronological history of project milestones and public activity.

This activity timeline is currently being expanded as additional public information becomes available.

Geography

Project Location

Geographic location and transportation context.

Geographic Location

Exact project boundary not yet verified.

Newberry County, Newberry County
Google Maps
Municipality
Newberry County
Nearby Transportation
Being verified
Sources

Research Library

Public sources and research articles associated with this project.

No public sources tracked yet.

Press

News & Public Information

Chronological list of public news articles.

Research for this project is currently being expanded.

Records

Public Documents

Downloadable public resources and official records.

Planning Documents

Not yet available

Rezoning Documents

Not yet available

Meeting Minutes

Not yet available

Utility Filings

Not yet available

Environmental Reports

Not yet available

Developer Presentations

Not yet available

Community

Questions Communities Often Ask

Common questions about digital infrastructure projects.

Knowledge Graph

Related Resources

Discover connected organizations, projects, research, and policy across the platform.

Sourcing

Evidence Used

6 evidence records referenced in connection with this project.

Press Releasereviewed

Charter Communications 2023 ESG Report

Charter Communications· Jan 25, 2025
Websitereviewed

Utilities

Newberry County Chamber of Commerce· Jan 1, 2024
Websitereviewed

Committed to Our Communities: Broadband Expansion

Charter Communications· Jul 1, 2025
Websitereviewed

City of Florence Utilities Information

City of Florence· Jul 21, 2026
County Agendareviewed

Florence County Council Regular Meeting Agenda

Florence County· Dec 9, 2021
Community

Help Improve This Resource

The Alliance continuously improves project information through public records and community contributions.

If you know of additional public information or believe this page can be improved, we encourage your participation.

Relationship Graph1 connection
Counties (1)
Newberry
LOCATED_IN · outgoing · confirmed