QTS Data Centers (Quality Technology Services)

QTS York County Data Center Campus (Project Cobra)

construction◆ highMixed Infrastructure
Clover, York County Last Updated: Unverified 0 Public Sources
Brief

Executive Summary

QTS Data Centers is developing a nine-building hyperscale campus on approximately 400 acres near Hands Mill Highway and Campbell Road in the Clover area of York County. The project, initially announced as a $1 billion investment and later expanded to an estimated $8 billion long-term commitment, represents the company's first facility in South Carolina. The campus utilizes a closed-loop cooling system that uses zero water for cooling and leverages carbon-free power where feasible.
Metrics

Project Snapshot

Key project metrics at a glance.

Estimated Investment
$8 billion
Estimated Jobs
2,001,000
Power Demand
Hundreds of MW MW
Water Demand
—
Site Acreage
400
Project Status
construction
Utilities

Cooling, Water & Electricity

Power, cooling, water, and wastewater for this project.

Utilities

Cooling, Water & Electricity

How this project is powered, cooled, and connected to local water and wastewater systems. Figures are drawn from public records and developer disclosures.

IT Cooling & Heat Rejection

Data centers remove heat in two stages: first from the servers (IT cooling), then from the building to the outdoors (heat rejection). The methods chosen drive water use, energy overhead, and neighborhood noise.

IT equipment
Air-Cooled
Heat rejection
Closed-Loop
Atmosphere
IT cooling method
Air-Cooled
Heat-rejection method
Closed-Loop
Cooling tower present
Unknown
Closed-loop claimed
True
Economizer (free cooling)
Unknown
Hybrid capability
No

Water Source & Demand

Data centers use water mainly for evaporative cooling and humidification. The source, quality, and use of reclaimed water determine the impact on local supply and aquatic systems.

Source: Unknown
Unknown
Facility
Discharge
Water provider
York County Water & Sewer
Provider type
Unknown
Primary source
Unknown
Cooling-water quality
Unknown
Average daily demand
1,667 gal/day
Provider upgrade required
Unknown

Wastewater Discharge

Water leaving the site is treated on-site, sent to a municipal plant, discharged directly, or evaporated. Zero-liquid-discharge (ZLD) systems eliminate liquid discharge entirely.

Facility
Unknown
Environment
Wastewater provider
York County Water & Sewer
Discharge method
Unknown
Upgrade required
Unknown

Electric Provider & Interconnection

A data center is among the largest electric loads a utility can serve. Demand is measured in megawatts; PUE relates total facility power to IT power (1.0 means all power reaches the IT equipment).

Grid
Substation
Facility
IT load
Retail provider
York Electric Cooperative
Interconnection utility
Duke Energy
Provider type
Unknown
Full-buildout demand
300 MW
Interconnection status
Unknown
Substation upgrade required
True
Transmission upgrade required
Unknown
Backup fuel
Unknown
Demand-response participation
Unknown

Renewable Energy Claims

Renewable claims describe how a facility matches its consumption with clean generation. The geography and matching method determine whether the claim reflects new, local clean energy or paper certificates.

Unknown
Matching
Facility
Renewable claim
Carbon-Free Operational Electricity
Claim type
Unknown
Renewable percentage
100 %
Claim geography
Unknown
Officially AnnouncedConfidence: MediumVerified: Jul 27, 2026
Chronology

Project Timeline

Chronological history of project milestones and public activity.

This activity timeline is currently being expanded as additional public information becomes available.

Geography

Project Location

Geographic location and transportation context.

Geographic Location

Exact project boundary not yet verified.

Clover, York County
Google Maps
Municipality
Clover
Nearby Transportation
Being verified
Sources

Research Library

Public sources and research articles associated with this project.

No public sources tracked yet.

Press

News & Public Information

Chronological list of public news articles.

Research for this project is currently being expanded.

Records

Public Documents

Downloadable public resources and official records.

Planning Documents

Not yet available

Rezoning Documents

Not yet available

Meeting Minutes

Not yet available

Utility Filings

Not yet available

Environmental Reports

Not yet available

Developer Presentations

Not yet available

Community

Questions Communities Often Ask

Common questions about digital infrastructure projects.

Knowledge Graph

Related Resources

Discover connected organizations, projects, research, and policy across the platform.

Community

Help Improve This Resource

The Alliance continuously improves project information through public records and community contributions.

If you know of additional public information or believe this page can be improved, we encourage your participation.

Relationship Graph2 connections
Counties (1)
York
LOCATED_IN · outgoing · confirmed
Organizations (1)
York Electric Cooperative (YEC)
SERVES · incoming · high