Expected combined investment of over $200 million across DC BLOX SC footprint.
DC BLOX Greenville County Data Center
Executive Summary
Project Snapshot
Key project metrics at a glance.
Cooling, Water & Electricity
Power, cooling, water, and wastewater for this project.
Cooling, Water & Electricity
How this project is powered, cooled, and connected to local water and wastewater systems. Figures are drawn from public records and developer disclosures.
IT Cooling & Heat Rejection
Data centers remove heat in two stages: first from the servers (IT cooling), then from the building to the outdoors (heat rejection). The methods chosen drive water use, energy overhead, and neighborhood noise.
Water Source & Demand
Data centers use water mainly for evaporative cooling and humidification. The source, quality, and use of reclaimed water determine the impact on local supply and aquatic systems.
Wastewater Discharge
Water leaving the site is treated on-site, sent to a municipal plant, discharged directly, or evaporated. Zero-liquid-discharge (ZLD) systems eliminate liquid discharge entirely.
Electric Provider & Interconnection
A data center is among the largest electric loads a utility can serve. Demand is measured in megawatts; PUE relates total facility power to IT power (1.0 means all power reaches the IT equipment).
Renewable Energy Claims
Renewable claims describe how a facility matches its consumption with clean generation. The geography and matching method determine whether the claim reflects new, local clean energy or paper certificates.
Project Timeline
Chronological history of project milestones and public activity.
This activity timeline is currently being expanded as additional public information becomes available.
Project Location
Geographic location and transportation context.
Research Library
Public sources and research articles associated with this project.
https://www.dcblox.com
News & Public Information
Chronological list of public news articles.
Research for this project is currently being expanded.
Public Documents
Downloadable public resources and official records.
Planning Documents
Not yet available
Rezoning Documents
Not yet available
Meeting Minutes
Not yet available
Utility Filings
Not yet available
Environmental Reports
Not yet available
Developer Presentations
Not yet available
Questions Communities Often Ask
Common questions about digital infrastructure projects.
Related Resources
Discover connected organizations, projects, research, and policy across the platform.
Related Counties
Related Organizations
Related Stakeholders
Help Improve This Resource
The Alliance continuously improves project information through public records and community contributions.
If you know of additional public information or believe this page can be improved, we encourage your participation.